Edenderry
Download the Edenderry brochure


For sale/let 16 Enterprise Units.
DescriptionAll units in Block 6 will be finished to high standard and will benefit from excellent loading facilities. Each unit offers spacious warehouse accommodation with a clear internal eaves height of approximately 6.1 metres to the underside of the haunch. The majority of the units will have two storey office accommodation with suspended ceilings, recessed lighting, electric storage heating and perimeter trunking.
Location
Edenderry Business Campus is located on Francis St which lies approximately 2km west of Edenderry town centre. Edenderry Business Campus is easily accessible and is on the R402 Tullamore to Dublin route and benefits from easy access to the M4 Motorway which is 18km away. Due to its close proximity to the M4, Kinnegad, Enfield & Kilcock, Edenderry is now considered a commuter town for those working in Naas, Dublin & Leixlip.
Sites for sale
Ranges and sizes from 0.5 to 5 acres.
OUTLINE SPECIFICATION
Superstructure
- Structural Steel portal frame construction, all to the required fire rating.
- Concrete Block walls.
- Precast concrete stair flights, half-landing, & upper floors.
- All units to be fireproofed in accordance with current regulations, and the approved Fire Certificate for the project.
- Kingspan KS1000RW, insulated composite roof cladding system.
- Double glazed roof lights equivalent to 10% of the warehouse floor area.
- Drainage to be from Insulated gutters, sealed to the roof cladding.
- Downpipes of Wavin or similar to run vertically, and birdcage strainer in the gutter fixed to the concrete walls.
- Kingspan KS1000RW, composite insulated wall-cladding system.
- Aluminium Framed double glazed windows & curtain walling, with tinted anti-sun glass as per Architects drawings.
- Insulated ground level access door, electrically operated on a 3-phase motor, 3m wide x 4.50m high generally.
- Steel faced fire exit doors located as required by Fire Certificate
- Three-phase power supply to distribution board in each unit, located in the warehouse.
- One 3-Phase Power socket & One Double single-phase power socket shall be located adjacent to the distribution board in the warehouse of each unit. Further distribution by occupant.
- Standard recessed modular lighting, 600mm x 600mm located in the office areas.
- Dado box trunking shall be fitted to walls in offices for distribution of power & data cabling.
- Single phase power sockets shall be located at various positions on dado trunking.
- Cabling only shall be provided to various locations for motion sensors for the installation of an Intruder Alarm by occupant.
- Cabling only shall be provided for the installation of contactors to all access doors (roller doors, fire escapes, front door. etc)
- Lighting to warehouse.
- Fire alarm system to standard requirements. Smoke heads located throughout the building as stipulated in building regulations.
- Office walls shall be plastered & painted.
- Stud partition, insulated, at first floor level to warehouse.
- Suspended ceilings to offices & stairwell
- Mild steel handrail to stairs with hardwood handrail, painted.
- WC pan & wash hand basin plumbed & fitted to disabled sized toilet.
- Door-sets to appropriate fire rating.
- Painted softwood skirting & architrave. Fitted Tea Station, with single bowl sink, & wall storage units.
- Reinforced concrete loading bay outside each Roller Shutter Door, brush finish, to falls & crossfalls on blinded hardcore.
- Precast concrete kerbing throughout.
- Main entrance roadways to be asphalt surfaced dense bitumen macadam on blinded hardcore.
- Carparking spaces to be Tarmac on blinded hardcore, with thermoplastic line markings, and unit numbering.
- Suitable & selected landscaping to external planter beds & roads verges, in accordance with the requirements of the planning permission.
- No heating in warehouse.
- No floor covering included to any section.
- No data cabling provided to any offices.
- No cables shall be provided for the installation of vibration sensors on the curtain walling, windows & frames.
- No internal cellular offices, office partitions, furniture, or other fit out works.
- No air-conditioning or provision for future installation of airconditioning.
- No fridge, dishwasher etc provided to tea station.
Roof Finish & Drainage
External Walls
Electrical Works
Internal Finishes
Loading Bay, Carpark & Access Road
Exclusions
Download the Edenderry brochure

